Post-Construction Anti-Termite Treatments
If somehow, if the pre-construction treatments were not carried out and if the constructed building is found infested with termites, do not worry, we are competent and experienced to provide suitable anti-termite treatments get rid of termites successfully for a reasonable period of time.
The crucial areas or entry points of termite infestation mentioned below need to be thoroughly treated.
- External area (Garden very near to walls / Foundation),
- Floor and Wall joints,
- Expansion/Construction joints,
- All wooden members- Doors, Window & Ventilator frames,
- Furniture, Fixed fixtures, Paneled woodwork, False ceiling etc.
- Entry points of incoming electrical, telecom, TV cable.
- Unused electrical terminals, electrical meter room etc.
- Entry points of Water pipes and Exit points of drainage lines.